ibano.com

Projects

Selected projects, 2007–2023

Browse the work by discipline. Client names are those of the project owners

Rail

2009–2010Florida, USA

Florida High-Speed Rail, Orlando–Tampa

Deputy program manager support for the FDOT general engineering consultant; string diagrams for the ARRA Track 2 application requesting $2.5 billion.

Brightline train in the Miami Design District
Han Zheng · CC BY-SA 2.0
2012–2013Florida, USA

All Aboard Florida (now Brightline)

RTC operations analysis of the Orlando–Miami passenger service on the FEC railroad: rolling-stock performance, capacity and schedule optimization.

Hartford Line train at New Haven
4300streetcar · CC BY 4.0
2008–2011Connecticut, USA

New Haven–Hartford–Springfield Commuter Rail

RTC simulation of shared Amtrak, freight and new commuter traffic for the environmental assessment and the ARRA Track 1A update.

Metro-North New Haven Line train approaching Stratford
4300streetcar · CC BY 4.0
2017–2018New York, USA

Metro-North Penn Station Access

RTC analysis of a proposed commuter line between New Haven and Penn Station.

Amtrak Cascades train at Everett Station
SounderBruce · CC BY-SA 2.0
2011Washington, USA

North Sound Regional Rail

Operations simulation of the Everett–Bellingham corridor and the capacity improvements needed for better passenger service.

Transit

Elevated viaduct of Lima Metro Line 1
Elelch · CC BY-SA 4.0
2011–2012Peru · Venezuela

Lima Metro and Caracas Metro

Track-component compliance for Lima Metro and station evacuation analysis with SimWalk; technical documentation review for Caracas Metro.

Historic streetcar on the Embarcadero, San Francisco
Grendelkhan · CC BY-SA 4.0
2007–2008California, USA

San Francisco E-Line Streetcar EIS

Alternative alignments, traffic conflicts and mitigation modeled in VISSIM and Synchro for the historic streetcar extension.

Traffic

2012–2013Florida, USA

Oakland Park Boulevard BRT

Verification and validation of a VISSIM model with 44 signalized intersections along a 13.5-mile corridor.

Interstate 10 eastbound towards Jacksonville
DanTD · CC BY 4.0
2019Florida, USA

I-10 Widening, I-295 to I-95

VISSIM tests of ramp, auxiliary and managed-lane configurations to find capacity issues and the best lane assignment.

Aerial view of State Route 237, San Jose area
Dicklyon · CC BY-SA 4.0
2009–2010California, USA

SR 237 Express Connectors

VISSIM modeling and analysis for VTA along I-880 and SR 237 in San Jose.

Agency & planning

2011Saudi Arabia

Jeddah Transportation Masterplan

Inception-phase project management, terms-of-reference review and oversight of site visits and data collection.

Clematis Street, downtown West Palm Beach
Sharon Hahn Darlin · CC BY 2.0
2020–2023Florida, USA

City of West Palm Beach programs

City Transportation Engineer: development plan review, ADA and neighborhood improvement programs, consultant-led safety studies.

Projects delivered as an employee of CDM Smith, T.Y. Lin International, Astaldi, VN Engineers, WGI and the City of West Palm Beach.

Discuss a project