Florida High-Speed Rail, Orlando–Tampa
Deputy program manager support for the FDOT general engineering consultant; string diagrams for the ARRA Track 2 application requesting $2.5 billion.
Projects
Browse the work by discipline. Client names are those of the project owners
Deputy program manager support for the FDOT general engineering consultant; string diagrams for the ARRA Track 2 application requesting $2.5 billion.

RTC operations analysis of the Orlando–Miami passenger service on the FEC railroad: rolling-stock performance, capacity and schedule optimization.

RTC simulation of shared Amtrak, freight and new commuter traffic for the environmental assessment and the ARRA Track 1A update.

RTC analysis of a proposed commuter line between New Haven and Penn Station.

Operations simulation of the Everett–Bellingham corridor and the capacity improvements needed for better passenger service.

Track-component compliance for Lima Metro and station evacuation analysis with SimWalk; technical documentation review for Caracas Metro.

Alternative alignments, traffic conflicts and mitigation modeled in VISSIM and Synchro for the historic streetcar extension.
Verification and validation of a VISSIM model with 44 signalized intersections along a 13.5-mile corridor.

VISSIM tests of ramp, auxiliary and managed-lane configurations to find capacity issues and the best lane assignment.

VISSIM modeling and analysis for VTA along I-880 and SR 237 in San Jose.
Inception-phase project management, terms-of-reference review and oversight of site visits and data collection.

City Transportation Engineer: development plan review, ADA and neighborhood improvement programs, consultant-led safety studies.
Projects delivered as an employee of CDM Smith, T.Y. Lin International, Astaldi, VN Engineers, WGI and the City of West Palm Beach.